SHIPMENT


For products purchased from our company, a customer representative is assigned to each order and follows the process to the end. When the order is received, the customer requests assembly by filling out the assembly request form according to the delivery date agreed with the customer. The assembly planning officer makes the planning for the assembly on the desired date. While the products are shipped, the delivery and installation of the products are carried out in coordination with the shipment. In cases such as the place is not ready, assembly planning is made again and the transactions are completed on the appropriate date.

You can make assembly requests for the products you have already purchased from our company and want to change the location. In such requests, an offer is submitted and if approved, the necessary assembly and installation is carried out.

Related to the place of installation;


Damage and wear and tear occur in products installed in areas with unfinished infrastructure and superstructure. Such situations create customer dissatisfaction, which we do not want at all, as damage and contamination occur in the products. It is more correct to install in accordance with the project after the necessary infrastructure and superstructure works are completed,
montaj
bilgilendirme

Information during the project phase;

  • The height and floor information (drywall, wall, etc.) of the place where the smart board, projection will be installed must be determined with the order.
  • If the floor at the height where the projection will be hung is drywall, there is a danger of falling short distance projections installed, it is necessary to reinforce the section to be mounted by making drywall or by having a profile or sheet metal sheet made later.
  • The floor on which the smart board will be mounted should be profiled according to the dimensions determined during drywalling,
  • The ceiling height of the place where the smart board and projection will be installed is also very important. It is not suitable for installation in areas below 290 cm.
  • The wall to be mounted must be flat, there must be no columns, if there are columns or areas of different heights, they must be leveled by the institution in advance.
At the project stage, the location of the waste water drain, clean water, electricity line should be specified, if not, it should be brought into the classroom by the institution. If it is necessary to break the floor, tiles, marble, granite, etc. should be specified, ventilation must be available.

In amplifier assembly, measurements are taken on site during the preparation of the projects at the order stage and production is made according to the project. Changes to be made by the customer in the project must be finalized before production. Changes made afterwards cause problems.
laboratuvar
Regarding furniture products, project layout drawings should be made according to the places where the products will be installed, it should be determined whether the products fit into the space, whether there are comfortable working areas, it is necessary to decide the direction of the table from the beginning in the placement of furniture products in the room. Additional products (skirtings, caissons, etc.) are assembled according to the direction of the table.

Later, when you want to change their direction, you may have to order new products.

In cases where you want support in assembly, you can request by e-mail from the contact section of our website or you can call our company by phone and get support from the assembly unit.